Location: 6th Floor, Sonalux House, Moi Avenue, Nairobi, Kenya

Office hours: Mon-Sat, 8am-6pm EAT

Data Centre Construction

What we deliver

Protection with purpose.

The right system is not defined by a product list. It is defined by how clearly it answers the risks, routines and responsibilities of the people using it.

  • Secure room design, containment and rack layout
  • Power distribution, UPS and generator integration
  • Environmental monitoring, fire detection and leak detection
  • Structured cabling, access layers and commissioning documentation
Data Centre Construction

Outcomes

  • An environment that tolerates a failure without losing service
  • Clear as-built documentation for every discipline
  • Headroom for growth that does not require a second rebuild

RPS method

From first question to ready system.

Plan

Define load, redundancy tier, growth and operating model

Coordinate

Work with civil, electrical and HVAC teams on a single drawing set

Commission

Test every failure path before go-live, not after

Monitor

Instrument the room so drift is visible early

Keep exploring

Other capabilities.

See more, react faster. We design and deploy high-definition surveillance systems with intelligent monitoring for homes, campuses, retail and enterprise sites.

  • IP surveillance
  • Remote monitoring
  • Analytics

Explore capability

Make every entry intentional. From biometrics and card readers to visitor management, we create frictionless access without compromising control.

  • Biometrics
  • Turnstiles
  • Visitor flow

Explore capability

A smart perimeter is your first line of defence. Our installations pair high-voltage protection with clean, discreet engineering and dependable alerts.

  • Perimeter security
  • Alarm integration
  • Maintenance

Explore capability

Turn uncertainty into a clear action plan. Our specialists uncover vulnerabilities, prioritise risk and help leadership make decisive security investments.

  • Risk reviews
  • Threat mapping
  • Advisory

Explore capability

Reference work

Sites you can check us against.

Customer names and marks are published with permission. Each tile opens the profile that records what the risk was, what went in, and what the client was handed at completion.

All reference profiles

More profiles are shared on request where the client has not published their own record.

Equipment we specify and integrate

WhatsApp us